https://adronhomesproperties.com/mediaredirect/
https://adronhomesproperties.com/mediaredirect/
https://www.accessbankplc.com/ https://www.accessbankplc.com/ https://www.accessbankplc.com/
ADVERTISEMENT
  • About Us
  • Privacy Policy
  • Contact Us
Monday, October 27, 2025
The Genius Media
  • Login
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
The Genius Media
No Result
View All Result
First Bank Ad First Bank Ad First Bank Ad
ADVERTISEMENT
ADVERTISEMENT

FG approves $5.8bn Mambilla Hydro Electric Power Plant contract

Tgmedia by Tgmedia
August 31, 2017
in Energy
0
ADVERTISEMENT

The Federal Executive Council on Wednesday approved the contract for the engineering work of the Mambilla Hydro Electric Power Plant in Taraba State at a sum of $5.792bn.

The Minister of Power, Works and Housing, Mr. Babatunde Fashola (SAN), disclosed this to State House correspondents at the end of the weekly meeting of the council presided over by President Muhammadu Buhari at the Presidential Villa, Abuja.

The contract was awarded to a consortium of three Chinese companies — Messrs CGCC-SINOHYDRO-CGOCC.

Fashola said the contract cost was inclusive of taxes, environment utilisation, the work proper, as well as project land acquisition and compensation to about 100,000 people who would be resettled.

He also said the construction would take approximately six years because of the extensive nature of the scope of work.

ADVERTISEMENT

The minister said the work would include the construction of four dams, one of which would be 150 metres high; two others would be 70 metres high while the smallest dam will be 50 metres in height.

He said, “Several efforts have been made to bring the project to reality since 1972, which is about 45 years ago, but I am happy to announce to you that this government approved the award of the contract today through a joint venture with a Chinese Civil Engineering Company for the engineering contract, including civil and electromechanical work, for $5.792bn.

“The construction should take about 72 months, which is roughly about six years. The scope of work is very extensive. It requires the construction of four dams: one of them is 150 metres in height, intermediate two are 70 metres in height; and the smallest of them is 50 metres in height.

ADVERTISEMENT

“The 150-metre one is essentially the size of a 50-storey building because you have approximately three metres per floor.

“The intermediate one is higher than a 20-storey building. It also includes 700 kilometre of transmission line. It will be in Taraba State, in the area called Gengu. It will involve a lot of preparatory work and resettlement.

“It will really unleash the potential that has been reported about Mambilla: agriculture, tourism and also for energy.

“It will also help Nigeria to strike a big blow on the climate change issue and fulfil its commitment under the Paris agreement because this is going to be renewable energy, coming also at a relatively competitive cost. This was approved by council today.”

On who would be paying the total contract sum for the Mambilla project and what role the government planned to play, Fashola said the major share of the money would come from the Chinese government through its Exim Bank.

He added that 85 per cent of the project cost would be financed by the Chinese government and Nigeria would bear only 15 per cent as its counterpart funding.

The minister, who said the project was designed to deliver 3,050 megawatts of power, however, said the productive output would be a function of water supply, because it remained the major source of fuel. (PUNCH)

Share this:

  • WhatsApp
  • Email
  • Tweet
  • Telegram

Like this:

Like Loading...
Previous Post

MIKEL OBI : I’ll ensure Eagles qualify for W’Cup

Next Post

Group Condemns Military from Monitoring Nigerians on Social Media

Related Posts

Energy

EFFC recovers NGN328.988 from nine oil Marketers

July 27, 2017
Energy

Relevance Of Oil To Diminish By 2040 – Minister Of Petroleum

September 28, 2020
BREAKING: Nigeria Cuts Off Electricity Supply To Niger Republic Over Military Coup
Breaking

BREAKING: Nigeria Cuts Off Electricity Supply To Niger Republic Over Military Coup

August 2, 2023
Next Post

Group Condemns Military from Monitoring Nigerians on Social Media

https://adronhomesproperties.com/mediaredirect/
ADVERTISEMENT

About Us

Thegenius Media.com.ng is an Online Nigerian NEWS HUB with good coverage and reportage of Exclusive Stories, Daily News Updates, Politics, Entertainment, Crime, Lifestyle, Relationship Tips and Sports.

RELEVANT PAGES

  • About Us
  • Privacy Policy
  • Contact Us

Alert Us

Important Press Releases, Breaking Stories, Special Investigations: thegeniusmedia1@gmail.com

Office Address

No 26 Oroleye Crescent off Abel Oreniyi Street.
Off Salvation Road, Opebi
Ikeja, Lagos

Tel:

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports

© TheGeniusMedia.com,ng

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
%d bloggers like this: