• ABOUT US
  • CONTACT US
  • Latest Naija News Today
  • Privacy Policy
  • TheGeniusMedia – Latest News, Naija News, and World News
Tuesday, June 30, 2026
The Genius Media NG
  • Login
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
The Genius Media NG
No Result
View All Result

Nigeria’s Nuclear Ambitions Boosted As Akkuyu NPP Unit 1 Construction Is Completed

Tgmedia by Tgmedia
June 30, 2026
in News
0
Akkuyu NPP Unit 1 Construction

Nigeria’s Nuclear Ambitions Boosted As Akkuyu NPP Unit 1 Construction Is Completed

" data-ad-slot="">

RelatedPosts

BREAKING: Panic As Patient Tested For Suspected Ebola In British Hospital [DETAILS]

Access Bank UK Polo Day Drives Global Support for Education of Vulnerable Children

BREAKING: Haaland Scores As Norway Defeat Ivory Coast To Qualify For 2026 FIFA World Cup Round Of 16

Nigeria’s Nuclear Ambitions Boosted As Akkuyu NPP Unit 1 Construction Is Completed

Advertisement. Scroll to continue reading.

 

ADVERTISEMENT

Nigeria is steadily advancing toward the development of its own nuclear energy sector. The country has already established partnership agreements with Rosatom, with site selection and preparation currently underway, along with the assessment of technical and economic aspects of future projects.

 

The technological foundation consists of modern Russian Generation 3+ reactors, similar to those now being commissioned at the Akkuyu NPP in Turkey.

 

Rosatom State Corporation, one of the world’s most renowned nuclear facilities has confirmed the completion of this Akkuyu Nuclear Power Plant Unit 1 construction

 

Rosatom State Corporation management delegation headed by Director General Alexey Likhachev visited the Akkuyu NPP site (under construction by Rosatom State Corporation). During the visit, the head of Rosatom got acquainted with the progress of the start-up and adjustment works at Unit 1, and also saw the active preparations underway for the stage of cold-hot running-in of the reactor plant.

 

Alexey Likhachev also visited the central hall of the reactor compartment of Unit 1, where he was informed of the successful completion of dummy fuel assemblies loading into the reactor, as well as the completion of the reactor assembly. After loading the dummy reactor core, specialists installed a block of protective tubes and the upper reactor unit, completing one of the most important stages of preparing the reactor plant for cold-hot running-in.

 

“We have registered the completion of construction works. The cold hydraulic tests of the reactor started tonight, and this work will be completed within a few weeks. There will be just a few weeks left before the start of launch operations, and based on the results of all the work done, an overhaul will be carried out and adjustments will be made to the final stage. This inspiring moment can be compared to the final hundred-meter race on a 42-kilometer marathon course. It is the very last dash when you need to mobilise all your forces, and a very important topic of the final dash is the launch of the maintenance staff work.

 

The staff of Unit 1 is 1,930 people, more than 40 % of these specialists are Turkish citizens. We are proud that these are graduates of our universities who are currently undergoing practical training at Russian simulators and nuclear power plants,” noted Rosatom Director General.

 

To ensure the station operates reliably, two key stages of run-in lie ahead. First, during the “cold” phase, specialists will check the density and strength of the equipment, perform circulating flushing of the first and second circuits, and adjust the water-chemical regime – this will confirm that all systems are ready for loads.

 

Then comes the “hot” stage: at a temperature of at least 260 °C, the four main circulation pumps will be tested, along with safety and reactor control systems, to verify reliability under operating conditions. These procedures are part of the standards for Generation 3+ reactors, which are used at Akkuyu NPP – Turkey’s first nuclear power plant, comprising four such power units.

 

For Nigeria, the completion of Unit 1 at Akkuyu is a tangible benchmark and confirmation that set goals are achievable through reliable international cooperation.

Share this:

  • Email a link to a friend (Opens in new window) Email
  • Tweet
  • Share on Telegram (Opens in new window) Telegram
  • Share on Reddit (Opens in new window) Reddit
  • Share on Tumblr
  • More

Like this:

Like Loading…
Tags: Akkuyu NPP Unit 1 ConstructionNigeria’s Nuclear AmbitionsNigeria’s Nuclear Ambitions Boosted As Akkuyu NPP Unit 1 Construction Is Completed
Previous Post

Access Bank UK Polo Day Drives Global Support for Education of Vulnerable Children

Next Post

BREAKING: Panic As Patient Tested For Suspected Ebola In British Hospital [DETAILS]

Related Posts

Court Convicts 10 Environmental Offenders
Health

Court Convicts 10 Environmental Offenders

by Tgmedia
October 17, 2023
0

Court Convicts 10 Environmental Offenders---Ten environmental offenders have been fined various sums of money, by Magistrate Daniel Njokwu of Lagos...

Read more
Thibaut #Courtois

BREAKING: Real Madrid In Trouble As Thibaut #Courtois Breaks His Anterior Cruciate Ligament [DETAILS]

August 10, 2023
JUST IN: UBA Celebrates Customer Service Week 2025 With Theme “Mission: Possible”; Redefining Service Beyond Limits

JUST IN: UBA Celebrates Customer Service Week 2025 With Theme “Mission: Possible”; Redefining Service Beyond Limits

October 5, 2025
Next Post
Ebola In British Hospital

BREAKING: Panic As Patient Tested For Suspected Ebola In British Hospital [DETAILS]

Please login to join discussion

About Us

Thegenius Media.com.ng is an Online Nigerian NEWS HUB with good coverage and reportage of Exclusive Stories, Daily News Updates, Politics, Entertainment, Crime, Lifestyle, Relationship Tips and Sports.

RELEVANT PAGES

  • About Us
  • Privacy Policy
  • Contact Us

Alert Us

Important Press Releases, Breaking Stories, Special Investigations: thegeniusmedia1@gmail.com

Office Address

No 26 Oroleye Crescent off Abel Oreniyi Street.
Off Salvation Road, Opebi
Ikeja, Lagos

Tel:

Copyright © 2024 TheGeniusMedia.com.ng

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports

© TheGeniusMedia.com,ng

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

Discover more from The Genius Media NG

Subscribe now to keep reading and get access to the full archive.

Continue reading

%d