https://adronhomesproperties.com/
https://adronhomesproperties.com/
https://adronhomesproperties.com/
https://adronhomesproperties.com/
https://www.accessbankplc.com/ https://www.accessbankplc.com/ https://www.accessbankplc.com/
ADVERTISEMENT
  • ABOUT US
  • CONTACT US
  • Latest Naija News Today
  • Privacy Policy
  • TheGeniusMedia – Latest News, Naija News, and World News
Sunday, May 31, 2026
The Genius Media NG
  • Login
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports
No Result
View All Result
The Genius Media NG
No Result
View All Result
First Bank Ad First Bank Ad First Bank Ad
ADVERTISEMENT
ADVERTISEMENT

Renewal Of Wärtsilä Long-Term Operation & Maintenance Agreement Provides Reliable Power Supply To Leading Nigerian Cement Producer

Tgmedia by Tgmedia
September 28, 2021
in Business
0
ADVERTISEMENT

RelatedPosts

Promasidor Nigeria Marks International Day of Families, Advocates Child Well-Being and Stronger Family Support Systems

Rite Foods Marks International Day of Families, Advocates Stronger Support for Children and Families

BREAKING: Nigeria Benefits As OPEC+ Approves Hike In Oil Production As US-Israel Vs Iran War Escalates

Renewal Of Wärtsilä Long-Term Operation & Maintenance Agreement Provides Reliable Power Supply To Leading Nigerian Cement Producer—-The technology group Wärtsilä has signed a 5-year long-term Operation & Maintenance (O&M) agreement with Lafarge Africa Plc, one of Nigeria’s leading building material producers. The agreement covers the 100 MW Lafarge Ewekoro power plant, which provides a dedicated supply of electricity to the company’s concrete and cement manufacturing processes. Signing of the O&M agreement took place in July 2021, and is an extension of a previous 10-year agreement.

 

The captive Ewekoro plant was supplied and commissioned by Wärtsilä in 2011. It consists of six Wärtsilä 50DF dual-fuel engines, operating primarily on gas, but with the flexibility to automatically switch to liquid fuel in case of a disruption to the gas supply. Similarly, should the quality of the gas supply be disrupted, the Wärtsilä engines will continue to operate efficiently, delivering an assured and reliable power supply to the facility. Unlike gas turbine plants, the engines will also function efficiently with a low-pressure gas supply, thus providing a huge advantage given the region’s vulnerability to such interruptions.

Renewal Of Wärtsilä Long-Term Operation & Maintenance Agreement Provides Reliable Power Supply To Leading Nigerian Cement Producer

ADVERTISEMENT

The captive power plant provides the cement production facilities steady supply of electricity and an efficient use of available natural gas as primary fuel. By having Wärtsilä operate and maintain the power plant, the customer can focus on its core business to deliver construction materials to Nigeria.

 

“We have benefited significantly from the efficient way by which Wärtsilä has operated and maintained this plant for the past ten years, and we had no hesitation in extending the agreement for a further five years. An uninterrupted reliable supply of electricity is essential to our production, and having our own power plant, built, operated and maintained by Wärtsilä, gives us this assurance,” said Lanre Opakunle, Strategic Sourcing Director, Power & Gas, Middle East & Africa, Lafarge – a member of Holcim Group.

 

ADVERTISEMENT

“Lafarge has been a customer with whom we have built a strong relationship over a number of years. Their readiness to renew this O&M agreement is a clear indication of satisfaction with our performance, and of how it supports the achievement of their business goals,” commented Marc Thiriet, Energy Business Director, Africa West, Wärtsilä Energy.

 

The scope of the agreement includes the operating crew, performance guarantees, plant availability, and spare parts.

Wärtsilä has also supplied Lafarge with another 100 MW power plant located in Mfamosing, Nigeria. With a total of 200 MW of generating capacity to the same customer, Wärtsilä has established a high level of trust that validates the efficiency of the company’s flexible and reliable technology.

 

Since 2010, Wärtsilä has had a strong presence in Nigeria with a total installed capacity of 667 MW. The company locally employs approximately 90 people. In Africa, Wärtsilä has an installed footprint of more than 7000 MW.

Share this:

  • Email a link to a friend (Opens in new window) Email
  • Tweet
  • Share on Telegram (Opens in new window) Telegram
  • Share on Reddit (Opens in new window) Reddit
  • Share on Tumblr
  • More

Like this:

Like Loading…
Tags: Renewal Of Wärtsilä Long-Term Operation & Maintenance Agreement Provides Reliable Power Supply To Leading Nigerian Cement Producer
" data-ad-slot="">
Previous Post

BREAKING: Air Vice Marshal Sikiru Smith Kidnapped By Unknown Gunmen

Next Post

How To Download ENaira App And Register For E-Naira Wallet As E-Naira Website Goes Live

Related Posts

Old Naira Notes
Banking

ATTENTION!!! #Emefiele Says Only #CBN Will Accept Old Naira Notes After February 10 Deadline

by Tgmedia
February 1, 2023
0

ATTENTION!!! #Emefiele Says Only #CBN Will Accept Old Naira Notes After February 10 Deadline----Godwin Emefiele, governor of Central Bank of...

Read more

ARSENAL FC: What Aliko Dangote Said About Buying #EPL Club

January 13, 2020
Lagos Assembly Commences Probe Of Auditor-General’s Report For MDAs

Lagos Assembly Commences Probe Of Auditor-General’s Report For MDAs

November 6, 2023
Next Post

How To Download ENaira App And Register For E-Naira Wallet As E-Naira Website Goes Live

https://adronhomesproperties.com/
https://adronhomesproperties.com/
" data-ad-slot="">

About Us

Thegenius Media.com.ng is an Online Nigerian NEWS HUB with good coverage and reportage of Exclusive Stories, Daily News Updates, Politics, Entertainment, Crime, Lifestyle, Relationship Tips and Sports.

RELEVANT PAGES

  • About Us
  • Privacy Policy
  • Contact Us

Alert Us

Important Press Releases, Breaking Stories, Special Investigations: thegeniusmedia1@gmail.com

Office Address

No 26 Oroleye Crescent off Abel Oreniyi Street.
Off Salvation Road, Opebi
Ikeja, Lagos

Tel:

Copyright © 2024 TheGeniusMedia.com.ng

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Politics
  • Business
  • Crime
  • Education
  • Health
  • Jobs
  • Sports

© TheGeniusMedia.com,ng

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

Discover more from The Genius Media NG

Subscribe now to keep reading and get access to the full archive.

Continue reading

%d